Procedures
From idea to keys
What each type of project involves — stages, typical durations and the permits you will need.
Typical project
Months by phase
Stacked bars — the length of each phase in a typical project.
- Design
- Approvals
- Construction
- Handover
0122436486072
2.1 yrs
10.5 mo
14 mo
6 mo
5.3 yrs
7 mo
Building a new houseRenovating an old structureAdding a floor or extensionInterior redesignUrban renewalCommercial fit-out
Budget over time
When the money is spent
Cumulative share of the budget across each project's timeline. Hover a chart for details.
100%50%0%
012.5 mo2.1 yrs
100%50%0%
05.3 mo10.5 mo
100%50%0%
07 mo14 mo
100%50%0%
03 mo6 mo
100%50%0%
02.6 yrs5.3 yrs
100%50%0%
03.5 mo7 mo
In detail
Every procedure, step by step
- Design
- Approvals
- Construction
- Handover
| # | Procedure | Stages · months · share of budget | Duration | Permits |
|---|---|---|---|---|
| 01 | Building a new houseFrom an empty plot to moving in. |
| Duration1.5–2.5 yearstypically 2.1 yrs | PermitsBuilding permit, utility connections, Form 4 |
| 02 | Renovating an old structureBringing an existing building back to life. |
| Duration6–14 monthstypically 10.5 mo | PermitsPermit if structure or facade change; engineer's survey |
| 03 | Adding a floor or extensionMore space on the house you love. |
| Duration10–18 monthstypically 14 mo | PermitsBuilding permit, neighbours' notice, structural approval |
| 04 | Interior redesignNew layout, materials and light — same walls. |
| Duration3–8 monthstypically 6 mo | PermitsUsually none |
| 05 | Urban renewal (TAMA 38 / Pinui-Binui)Strengthening or rebuilding a residential block. |
| Duration3–7 yearstypically 5.3 yrs | PermitsResidents' majority, municipal approval, building permit |
| 06 | Commercial fit-outOffices, shops and restaurants, ready to open. |
| Duration4–9 monthstypically 7 mo | PermitsBusiness licence, fire-safety approval |
Durations are typical ranges for projects in Israel and depend on the site, the municipality and the scope of work.

Get in touch
Have a project in mind?
Tell us about it — we reply within two working days.
Start a conversation